Missouri High Priority Bike/Ped/ADA Projects

Improve/widen sidewalk on Hwy E/I-44 interchange, Rolla (09ROL1129)

Status:

City: Rolla.    Route: Hwy E/I-44    Location: Interchange at Hwy E/University Ave/I-44

Type: Sidewalk

Description:
The HWY E/University Drive overpass on I-44 is absolutely terrible for cyclists or pedestrians. The lone sidewalk on the bridge is so narrow that it is essentially unsafe for cyclists, especially if pedestrians or other cyclists happen to be on it. I would almost say that it's impossible for two pedestrians to pass each other without rubbing shoulders. So the cyclists are essentially forced to use the traffic lane on the busy overpass/roundabout.

Importance:
High use, near city, very near University with high ped & bike traffic. Extremely narrow sidewalk is impossible for wheelchair users to pass and close to impossible for bicyclists. Simple fix would take a foot or two of roadway & move the concrete sidewalk barrier over a foot or two.

Obstacles:
0

Scores
Need Potential Significance Cost Readiness Total
68 61 57 62 60 61.53

 

 

Map

Top 8 Project
Top 100 Project

Facility Type(s):
·Sidewalk

School:
·Bicycle
·Pedesrian
·ADA