Missouri High Priority Bike/Ped/ADA Projects

Widen/improve Hwy 51 Mississippi River River Bridge, Claryville-Chester, on TransAmerica Bicycle Route (10NAT0019)

Status:

City: Claryville.    Route: Hwy 51    Location: Hwy 51 Mississippi River Bridge

Type:

Description:
When the Hwy 51 Mississippi River Bridge is replaced, include bicycle/pedestrian path or shoulders/bicycle lanes as appropriate.

Importance:
The Hwy 51 Mississippi River Bridge has been identified by cross-country bicyclists travelling the TransAmerica Bicycle Route as the most difficult/dangerous single spot for bicycling on Missouri's section of the TransAmerica route. When the bridge is replaced it should include appropriate bicycle/pedestrian accommdodations

Obstacles:
There is little that can be done to improve width or add a lane/path until the main bridge is replaced.

Scores
Need Potential Significance Cost Readiness Total
93 53 92 40 40 63.40

 

 

Map

Top 8 Project
Top 100 Project

Facility Type(s):
·Shoulder
·Sidewalk
·Bike Lane
·Curb Ramp

School:
·Bicycle
·Pedesrian
·ADA